If available, install a shear pin (#787) in the spare shear pin location. Torque the shear pin to 20 inch-pounds (~ 1.5 ft-lbs).
Remove the shear pin (#787) located in the spare shear pin location of the breakaway and install in place of the original. A towel wrapped loosely around the breakaway can help to minimize fuel spills. CAUTION: Reconnection can cause a small amount of gasoline to leak out of the breakaway. When dowel pin and guide are aligned, continue squeezing tool grip until the breakaway halves join together. Align the dowel pin in the bottom half of the breakaway with the dowel pin guide located in the 6-2 ARB Approved IOM 6 - Healy Breakaway Model 8701VV - Executive Orders VR-201 and VR-202ģ top half of the breakaway. Check the main o-ring for position as the top and bottom of the breakaway come together. Slide the separated bottom half of the breakaway (with hose and nozzle attached) onto the bottom clamp of the Breakaway Reconnection Clamp and begin squeezing the grip to slowly bring the two halves together. Slide the top clamp of the Breakaway Reconnection Clamp onto the two flat surfaces on the top half of the breakaway (See Figure 1) installed on the dispenser (attached to whip hose). After completing inspection, lightly lubricate the main o-ring on the top half of the breakaway. A gentle tap on the opposite side of the breakaway should eject the pin. Check the shear pin bushing hole (see Figure 2) located in the top half of the breakaway for any part of the pin left behind at separation. Inspect each half of the separated breakaway for obvious damage to the outer-shell, plastic inserts or o-rings including cracks, chips or tears that may effect reconnecting the two halves. HEALY BREAKAWAY RECONNECTION CLAMP TOOLS NEEDED: Healy Breakaway Reconnection Clamp, Part No mm Hex Head Socket Torque wrench Safety glasses RECONNECTION PROCEDURE 1. NOTE: Breakaway Reconnections must be logged in the GDF Maintenance Log. 6-1 ARB Approved IOM 6 - Healy Breakaway Model 8701VV - Executive Orders VR-201 and VR-202Ģ DRIVE-OFF BREAKAWAY RECONNECTION PROCEDURE Use this procedure to either reconnect or disconnect (reverse order) the Healy 8701VV Breakaway as part of Section 1.4 Procedure for Reconnecting Breakaway and Testing Fueling Point after Drive-Off in the Assist Systems Scheduled Maintenance. Be sure the vapor tube fitting slides easily into item 3 before final tightening. install the secondary hose and tighten to 35 to 70 foot pounds. Be sure the vapor tube fitting slides easily into item 2 before final tightening. 1 Healy Model 8701VV Breakaway 35 to 70 foot pounds.